No communities match these filters. Clear the filters or try another search.
Hover or focus a First Nation dot to show only its reserve lands. On a touchscreen, tap a dot once to reveal its lands and tap it again to open the community overview.
Public updates connected to Saskatchewan First Nations from official community channels, organizations, government releases, and reputable news outlets.
Source first: OpenBand shows the original source and publication date for each update.
Public records, easier to review
OpenBand organizes public FNFTA filings into searchable profiles while keeping original source documents one click away.
Every result starts from an Indigenous Services Canada filing page or PDF.
Parsed carefully
OpenBand labels pending and manual-review records instead of presenting uncertain figures as complete.
Built for verification
Source links, filing status, CSV exports, and citation tools remain attached to the records.
Canoe Lake Cree First Nation394 Financial Records
Public FNFTA filing availability, parsed Chief and Council remuneration, audited financial statements, and original Indigenous Services Canada source documents.
Canoe Lake Cree First Nation is a Cree community in northwestern Saskatchewan whose land-based history predates Treaty 10. Hunting, fishing and trapping sustained community members across a broad traditional territory before and after treaty signing. [2] On September 19, 1906, Chief John Iron and Headmen Baptiste Iron and Jerome Couilloneur signed Treaty 10 at Île-à-la-Crosse, according to the commissioner’s report, with the Crown’s commissioner, James Andrew Joseph McKenna. [1] The creation of the Primrose Lake Air Weapons Range in 1954 restricted access to approximately 75% of the Nation’s most productive traditional lands. A subsequent claim was settled in June 1997. [2] These documented events describe part of the Nation’s treaty-era and later history; treaty records are not a complete account of its older Indigenous history or continuing Cree identity.
1954 · Primrose Lake Air Weapons Range — The range’s establishment removed access to about three quarters of the Nation’s most productive traditional lands, disrupting land-based livelihoods. [3]
1975–1997 · Claim and settlement — Canoe Lake submitted a claim in 1975 for the loss of traditional territory. Canada accepted it in 1995, and a settlement followed in June 1997. [3]
Signing location: McKenna’s contemporary report places the Canoe Lake band’s September 19 signing at Île-à-la-Crosse. A later OTC account lists Canoe Lake. The location above follows the contemporary report; the date is consistent across these accounts. [1][8]
Chief William Apisis signed Treaty 10 at Île-à-la-Crosse on August 28, 1906. The English River and Canoe Lake bands participated in the same 1906 treaty process. [1][4]
Clear Lake Band Historical band
Chief Raphael Bedshi-Dekkge signed Treaty 10 in 1906 for the historical Clear Lake Band, another participant in the original negotiations. Later known as the Peter Pond Band, it divided in 1972 into Buffalo River and Turnor Lake, now Birch Narrows Dene Nation. [7][5][9]
These are shared historical treaty relationships. The historical Clear Lake Band is distinct from today’s Nations; these links do not imply common language, ancestry, governance or a political alliance.
Verified Projects & Partnerships
Confirmed developments and independently corroborated economic relationships from reviewed public sources.
3 verified
Renewable EnergyUnder Construction
Rose Valley Wind Project
A 200 MW wind project near Assiniboia, co-owned by Potentia Renewables and M-Squared Renewables, the partnership of Meadow Lake Tribal Council's nine Nations and Mistawasis Nêhiyawak. M-Squared owns 51%. Construction began in June 2026, with operation expected in late 2027 under a 30-year SaskPower power purchase agreement.
A planned solar facility near Coronach, co-owned by Potentia Renewables and M-Squared Renewables, the partnership of Meadow Lake Tribal Council’s nine Nations and Mistawasis Nêhiyawak. M-Squared will own 51%, equivalent to 51 MW of the 100 MW project on an ownership-weighted basis. SaskPower has signed a 25-year power purchase agreement and expects operation in late 2027.